English: I who am a contributor drew the picture by a software which developed by myself.
The survey map which I referred to depends on "「第30図 ソウ山支群測量図(3)」『石川県鳥屋町川田古墳群』鳥屋町教育委員会(2001年)".
This is a drawing of present situation (not a drawing of a restored mound).
The drawing depends on combination of wire frame and height eight phases classification. Parallel projection.
{{Information |description ={{en|1=I who am a contributor drew the picture by a software which developed by myself. The survey map which I referred to depends on "「第30図 ソウ山支群測量図(3)」『石川県鳥屋町川田古墳群』鳥屋町教育委員会(2001年)". This is a drawing of present situation (not a drawing of a restored mound). The drawing depends on combination of wire frame and height eight phases classification. Parallel projection.}} {{ja|1=投稿者が自ら開発したソフトウェアで描画。 参照した測量図は、「第30図 ソウ山支群測量図(3)」『石川県鳥屋町川田古墳群』鳥屋町教育委員会(2001年)による。 この...