English: The water level has reached alarming levels of 365 feet owing to the rapid meltdown of glacier in the last two days. Chinese and Frontier Works Organisation [FWO] engineers began cutting the 196,000 cubic metre-high debris from the Attabad Dam in January 4 2010 after a massive landslide blocked the once fast flowing Hunza River at Attabad, creating a lake that submerged at least five villages as it expended. The land slide has completely blocked the Hunza River.
2010-05-26 18:43 Shakeelgilgity 2592×1944× (1040642 bytes) {{Information |Description = The water level has reached alarming levels of 365 feet owing to the rapid meltdown of glacier in the last two days. Chinese and Frontier Works Organisation [FWO] engineers began cutting the 196,000 cubic metre-high debris
{{BotMoveToCommons|en.wikipedia|year={{subst:CURRENTYEAR}}|month={{subst:CURRENTMONTHNAME}}|day={{subst:CURRENTDAY}}}} {{Information |Description={{en|The water level has reached alarming levels of 365 feet owing to the rapid meltdown of glacier in the l